SUBSIDY & FINANCING

PM Surya Ghar Yojana & Solar Subsidy in Delhi NCR

A simple guide to PM Surya Ghar Yojana, covering subsidies, documents, DISCOM process and application support across Delhi NCR, UP and Haryana.

SCHEME OVERVIEW

Understanding PM Surya Ghar Muft Bijli Yojana

PM Surya Ghar Muft Bijli Yojana is a central government scheme, launched in February 2024, aimed at putting rooftop solar on one crore Indian households and cutting household electricity bills through net metering. It is implemented nationally through the National Portal in partnership with each state’s distribution company (DISCOM), which means the subsidy amount and application steps are broadly the same everywhere, but the DISCOM you deal with, net metering timelines and any additional state-level top-up differ by state.

For households in Ghaziabad, Noida and Greater Noidathe scheme runs through Uttar Pradesh’s DISCOMs; in Delhi it runs through BSES and Tata Power-DDL; and in Gurugram, Faridabad and the rest of Haryana it runs through DHBVN/UHBVN. ECO-REFORMERS handles the on-ground process for all three, from portal registration to final subsidy disbursal, and this page breaks down what to expect in each.

0Max. Central Subsidy (₹)
0Free Units/Month Possible*
0NCR States We Cover
0Scheme Launched
Rooftop solar panels on an Indian home
WHO CAN BENEFIT

Households Considering Rooftop Solar

The scheme is aimed at residential rooftop solar adopters — independent houses, builder floors, DDA and society flats, and farmhouses — with an existing grid electricity connection. It applies equally to a 2BHK flat in Indirapuram, an independent house in Rohini, or a villa in Sushant Lok, Gurugram, though the exact roof-ownership and consent paperwork can vary between an independent house and an apartment in a society. Whether a specific household qualifies depends on current government criteria and your DISCOM’s technical feasibility check at the time of application.

ELIGIBILITY

General Eligibility Considerations

Eligibility criteria may include property ownership, roof suitability, and other conditions defined by the scheme. We recommend verifying current eligibility rules through official government sources before proceeding.

Indian Resident, Own Roof

Applicant should be an Indian citizen with a shadow-free roof they own or have clear consent to use.

Existing Electricity Connection

A valid domestic/residential connection with your local DISCOM (BSES, Tata Power-DDL, PVVNL, NPCL,
DHBVN or UHBVN) in your own name.

No Prior Rooftop Subsidy

The household should not have already availed a central rooftop solar subsidy on the same connection.

Residential Use Only

The central subsidy is for residential rooftop solar; commercial and industrial premises use a
different route — see our Financing page.

SUBSIDY AMOUNT

PM Surya Ghar Yojana Subsidy Slabs

The central subsidy (Central Financial Assistance) is the same on-paper structure across Delhi, Uttar Pradesh and Haryana, disbursed by direct benefit transfer to your bank account after commissioning. It applies to on-grid systems using ALMM-listed (MNRE-approved) panels and inverters, is capped at 3 kW for residential households, and current figures should always be confirmed via the official National Portal at the time of application.

Subsidy is applicable to residential rooftop solar and is disbursed through the official PM Surya Ghar Yojana National Portal after net metering and inspection formalities are completed by your DISCOM. Beyond 3 kW the central subsidy amount does not increase further; households needing more capacity can still install a larger system but the CFA remains capped. Commercial and industrial installations are not covered under this residential subsidy — see our Solar Financing / EMI page instead.

Indicative central subsidy under PM Surya Ghar Yojana (residential rooftop solar)
System Size Indicative Central Subsidy Typically Suits
Up to 1 kW Approx. ₹30,000 1–2 BHK, bills under ~150 units/month
Up to 2 kW Approx. ₹60,000 2–3 BHK, ~150–250 units/month
3 kW and above (residential) Capped at approx. ₹78,000 3–4 BHK independent house, 250–400+ units/month
STATE-WISE DETAILS

PM Surya Ghar Yojana Across Delhi, UP & Haryana

The National Portal and central subsidy slabs are common, but your DISCOM, nodal agency, documentation and typical timelines depend on which part of the NCR your property is in. Here's how it breaks down.

Uttar Pradesh (NCR)PVVNL / NPCL

DISCOMs
Paschimanchal Vidyut Vitran Nigam (PVVNL) covers most of Ghaziabad & Greater Noida; Noida Power
Company Ltd (NPCL) covers Noida & parts of Greater Noida
Application Route
National Portal, feasibility & net metering coordinated with UPNEDA and your local DISCOM
sub-division
State-Level Support
UP has run additional state incentives via UPNEDA from time to time on top of the central subsidy;
availability and amount change, so we verify current status per application
Typical Property Types
Independent houses in Vaishali, Indirapuram, Raj Nagar, Noida sectors, GNIDA plots, societies
Indicative Timeline
Roughly 45–90 days, portal to disbursal

HaryanaDHBVN / UHBVN

DISCOMs
Dakshin Haryana Bijli Vitran Nigam (DHBVN) covers Gurugram, Faridabad & south Haryana; Uttar
Haryana Bijli Vitran Nigam (UHBVN) covers the north
Application Route
National Portal, with technical feasibility, inspection and net meter installation handled by your
DHBVN/UHBVN sub-division
State-Level Support
Haryana has run its own solar and rural electrification incentives alongside the central scheme;
eligibility for any add-on benefit depends on current state policy
Typical Property Types
Independent houses and villas in Gurugram, Faridabad and NCR-adjoining Haryana towns
Indicative Timeline
Roughly 45–90 days, portal to disbursal

Exact document requirements can vary by DISCOM and by property type (independent house vs. flat vs. society roof); we guide customers through the current checklist for their specific Delhi, UP or Haryana DISCOM at the time of application.

APPLICATION PROCESS

Steps Involved in Applying

The steps are the same everywhere in the NCR — only the DISCOM you interact with at steps 2 and 4 changes between Delhi, UP and Haryana.

01

Portal Registration

Register on the PM Surya Ghar National Portal with your consumer number, state, DISCOM and electricity bill details.

02

Site Feasibility

ECO-REFORMERS surveys your roof and consumption; your DISCOM (BSES/Tata Power-DDL, PVVNL/NPCL or DHBVN/UHBVN) confirms technical feasibility.

03

System Installation

An empanelled vendor installs the ALMM-approved panels and inverter sized to the approved capacity.

04

Net Metering

Net meter installation and inspection by your DISCOM, and upload of the commissioning report on the portal.

05

Subsidy Disbursal

Central subsidy is credited by direct benefit transfer to your bank account once approved.

DOCUMENTS

Documents Commonly Required

Identity Proof

Aadhaar card, matching the name on your electricity bill.

Property/Ownership Proof

Registry, sale deed or society NOC for flats and society-owned terraces.

Recent Electricity Bill

Latest BSES/Tata Power-DDL, PVVNL/NPCL or DHBVN/UHBVN bill with your consumer account number.

Bank Account Details

Aadhaar-linked bank account and a cancelled cheque or passbook copy, for DBT of the subsidy.

Exact document requirements can vary by DISCOM and by property type (independent house vs. flat vs. society roof); we guide customers through the current checklist for their specific Delhi, UP or Haryana DISCOM at the time of application.

Net metering setup for subsidised rooftop solar
NET METERING

A Required Step for Subsidy Approval

Net metering installation and inspection by your local discom is a required step before subsidy disbursal under the scheme. In practice this means a joint inspection visit and bi-directional meter swap by BSES/Tata Power-DDL in Delhi, PVVNL/NPCL in Ghaziabad, Noida and Greater Noida, or DHBVN/UHBVN in Gurugram, Faridabad and the rest of Haryana — ECO-REFORMERS schedules and follows up on this visit on your behalf so it isn’t left to chance.

INSTALLATION PROCESS

How ECO-REFORMERS Supports the Process

We assist customers with system design, installation, and coordinating the paperwork associated with the subsidy application, working alongside the applicable government process. That includes helping with National Portal registration, liaising with your DISCOM for feasibility approval and the net-metering visit, and following up until the subsidy is credited — whether your property is in Delhi, Ghaziabad, Noida, Greater Noida or Gurugram/Faridabad in Haryana.

FAQ

PM Surya Ghar Yojana Questions

The central subsidy amounts and slab structure are set by the government and may change; always verify current figures through the official PM Surya Ghar National Portal, and ask us to confirm the live figure for your specific application.

The central subsidy slabs are the same nationwide, including across Delhi, UP and Haryana. What differs is the DISCOM you deal with (BSES/Tata Power-DDL, PVVNL/NPCL, or DHBVN/UHBVN), local net metering timelines, and whether a separate state-level top-up scheme happens to be active at the time — we check this per application.

PM Surya Ghar Yojana is primarily aimed at residential rooftop solar; commercial solar has separate financing considerations, see our Financing page.

Timelines depend on the DISCOM and government process and can vary by region; as a rough guide, most applications across Delhi, UP and Haryana take somewhere in the region of 45–90 days from portal registration to subsidy disbursal, assuming documents and site feasibility are in order.

In Delhi it's BSES Rajdhani, BSES Yamuna or Tata Power-DDL depending on your locality; in Ghaziabad and Greater Noida it's mostly PVVNL, with NPCL covering Noida and parts of Greater Noida; in Gurugram, Faridabad and the rest of Haryana it's DHBVN or UHBVN. Check your electricity bill for the exact DISCOM name, or ask us during your site survey.

The scheme is designed so that a correctly sized rooftop system (typically 1–3 kW for an average household) can offset up to roughly 300 units of monthly grid consumption for many households, depending on your actual usage, roof sun exposure and system size — it isn't a flat cash payment, but a reduction in what you draw from the grid via net metering.

Yes, individual flat owners can apply for their own connection, and RWAs/societies can pursue common-area rooftop solar separately; terrace access and no-objection consent from the society are usually needed in either case, which we help coordinate.

Common reasons include a name mismatch between your bill, Aadhaar and bank account, using non-ALMM-listed panels, or incomplete feasibility approval. We review documents and equipment choice upfront specifically to avoid these issues before you apply.

ENQUIRY FORM

Get a Free Solar Quote

Share a few details and our solar consultants will get back to you within 24 hours with a tailored recommendation.

Thank you — your enquiry has been received. Our team will contact you shortly.

This is a static website form. To go live, connect it to a form-handling endpoint and remove the client-side preventDefault().

CUSTOMER TESTIMONIALS

What Our Customers Say

Real feedback from homeowners and businesses ECO-REFORMERS has installed solar for across Ghaziabad, Noida, Greater Noida, Delhi and the wider NCR.

Their team guided us through PM Surya Ghar Yojana eligibility and the subsidy actually came through. Highly recommend for first-time solar buyers.

Suman Tiwari
Delhi NCR

Installed a 5kW on-grid system for our house. The crew was tidy, safety-conscious, and finished within the promised timeline.

Ramesh Yadav
Greater Noida

From subsidy paperwork to panel mounting, everything was handled on time. Genuinely happy with the switch to solar for our home.

Neha Kapoor
Noida

Our hybrid system with battery backup means the shop no longer loses hours to power cuts. The after-sales support has been prompt whenever we’ve called.

Deepak Chauhan
Ghaziabad

We compared three vendors and ECO-REFORMERS gave the most honest, itemised proposal. No pressure tactics, just clear numbers and a clean installation.

Priya Malhotra
Delhi

Good communication throughout our commercial rooftop project. The system was sized correctly for our factory load and savings started from month one.

Sanjay Gupta
Greater Noida

Professional and responsive from the site survey to the final net metering paperwork. They handled the DISCOM formalities so we didn’t have to.

Anita Verma
Noida

The team explained every step clearly and the installation was completed on schedule. Our electricity bill has dropped noticeably every month since.

Rohit Sharma
Ghaziabad

Rated 5.0 on Google, based on customer reviews.

Ready to Switch to Solar?

Talk to ECO-REFORMERS about a solar solution designed for your home or business.

Call Now WhatsApp
Get DirectionsWhatsApp UsCall Now